The 2×4 wood framing is complete on the walls along with the bulkheads. I have installed cross bracing to strengthen the walls keeping everything straight until the spray insulation is applied.  I have roughed in the pot light locations and made careful notes. Tomorrow the spray insulation will be finished and then the drywall boarding and taping can begin. Everything is neat and clean- ready for the next step.