Photo Gallery Pages - Basement

D&K During

D&K    During

First Previous Next Last

Once the ductwork was reconfigured and installed AGGroup was able to start framing. You can see the framing around the new ductwork is much better and now you can walk underneath with no problem. On the left of the upper bulkhead you can see all water lines have been moved so the whole ceiling does not need to be strapped thus cutting down on material & labor costs for the client.